Data Transfer & Storage

Data Transfer & Storage

  1. When a device is replaced, the new device is connected to all historic data.
  1. All measured data will therefore still be available after the meter replacement has been done.
  2. Data lost during the period that the device was offline will not be recoverable. 
  1. Where data is lost, a request can be made to the Augos support staff for a data interpolation or replication to be done.
  1. Interpolation is where a device's energy register has a change in reading value between the device going offline, and reconnecting. The total consumption can fill the data gap with a flat line and no profile.
  2. Replication involves taking data from a comparable period, and replicating it into the period with missing data. This will not be an accurate representation of the lost data, but rather an estimation based on previously measured data to reduce the impact of long term data views.


    • Related Articles

    • Hardware Replacement Policy

      PURPOSE: This hardware replacement Policy outlines the procedures and guidelines for the replacement of Augos measurement hardware. The purpose of this hardware replacement policy is to establish clear guidelines and procedures for managing the ...
    • Symptom: FTP6 ERROR

      Device shows “FTP6” on the screen This is typically shown when the data on the sim card has been depleted. If within South Africa, contact the network service provider, and confirm that the sim is active and has data available. If additional data is ...
    • Factors that could necessitate verification

      Excessive Billing variances against recorded meter data. 3rd Party metering or Logging discrepancies on the same measurement points. Energy Performance Certification Requirements. Audit Requirements..
    • Symptom: Sim Config Error

      Device Shows “Sim Config Error” on screen Ensure the sim card is present and installed correctly Manually reset the meter If the issue persists, check with the network provider that the sim is active and has data available, and advise further based ...
    • Meter Verification Procedure

      A reasonable investigation and justification should be made for the verification of a device. On request, an Augos support representative will do a thorough remote investigation to confirm what further action is required This includes: 3 months Bill ...